Skip to main content

Industrial solar · 100 kW system

100 kW Solar Plant Cost — Industrial Solar EPC Pricing

A 100 kW solar plant generates roughly 1,60,000 units a year — about 430 to 450 units a day — at an indicative installed cost of ₹40,00,000 to ₹50,00,000. At this scale it is a captive generation asset for a manufacturing plant, an industrial campus or a large hospitality property, and it is delivered as a full EPC project rather than as an installation.

Indicative cost

₹40,00,000–₹50,00,000

installed, before tax treatment

Generates

430–450

units per day in Jaipur

Payback

3 to 4

years, at the tariff modelled below

The array is the least interesting part. What decides whether a 100 kW plant performs is the engineering around it: structural capacity across a large roof area, the interface with an already-loaded electrical system, protection coordination, earthing and lightning protection across a much larger footprint, and a commissioning programme that proves performance with measurements.

Specification

100 kW solar system — cost, output and requirements

Every figure below is modelled for Jaipur-region conditions on a clean, unshaded, correctly designed array. They are planning numbers, not a quotation.

100 kW solar system specification, cost and generation summary
System capacity100 kW
Indicative installed cost₹40,00,000 – ₹50,00,000
PM Surya Ghar subsidyNot applicable — the scheme covers residential connections only
Tax treatmentAccelerated depreciation available to profit-making entities
Daily generation430 to 450 units on an average day
Annual generationAbout 1,60,000 units
Roof area requiredAbout 7,500 sq ft, shade-free
Solar panels180 to 185 modules at present-day panel wattage
Indicative annual savingAbout ₹14,40,000
Simple payback3 to 4 years

Pricing is an indicative installed-cost band, not a quotation. Roof type, structure, mounting height, cable run length and module availability all move the figure, and a firm price is issued only after a site survey. Generation assumes roughly 1,600 kWh per kWp per year; savings assume the tariff stated on this page. Subsidy figures follow PM Surya Ghar as currently notified — verify current rates at pmsuryaghar.gov.in.

In practice

What a 100 kW system actually powers

Capacity is easy to quote and hard to picture. This is what the generation covers in a real building.

  • A multi-shift manufacturing plant
  • A large industrial campus or process facility
  • A resort or multi-building hospitality property
  • A large cold chain or warehousing operation

Delivered as an EPC project, not an installation

A 100 kW plant is engineering, procurement and construction under one scope with defined stages: survey and feasibility, detailed design, procurement against specification, construction to method statements, and commissioning with documented results.

That structure exists to remove the seams. When design, supply and construction sit with different parties, the gap between them is where underperformance hides — and by the time it shows on a generation report, nobody owns it. One scope means the party that modelled the yield is the party that signs the commissioning report.

Connection, protection and power quality

At 100 kW the point of connection is a design decision, not a default. Depending on the site this may be an LT connection into a main panel with adequate headroom, or an HT interface with its own transformer and protection scheme. Sanctioned load, transformer capacity and existing utilisation all feed into it.

Industrial environments are also electrically noisy. Welding plant, VFDs, large motors and unbalanced loads all affect how inverters behave and how protection should be set. We assess the existing installation before designing the interface rather than assuming a clean supply.

Rooftop, ground-mount, or both

A 100 kW rooftop array needs around 7,500 sq ft of structurally sound, shade-free roof. Many industrial sites have the area but not the structure, and some have both roof and spare land — in which case a split configuration is often the best answer, using the sound part of the roof and placing the balance on ground.

We assess all three options against structure, shading, cleaning access and long-term maintainability, and recommend the one the site supports rather than the one that is quickest to build.

No obligation, no cost

Before you buy a 100 kW system, get the numbers

Solar is a twenty-five year decision made on a single afternoon's information. Before you commit to a system in Jaipur, we will give you the numbers to decide with — and tell you if the answer is that solar is not worth it on your roof.

  • Free solar consultation

    A conversation with an engineer, not a salesperson — what your roof and your load can actually support.

  • Free site survey

    Roof measurement, structural check and a seasonal shadow analysis carried out at your property.

  • Free savings report

    Your last twelve months of bills modelled against real generation figures for your location.

  • Free ROI calculation

    Payback period, lifetime savings and the honest sensitivities — including what happens if tariffs stay flat.

  • Free subsidy assessment

    What you may qualify for under PM Surya Ghar, and what the net cost is after it lands.

100 kW solar system — frequently asked questions

What is the cost of a 100kW solar plant in Rajasthan?

Indicatively ₹40,00,000 to ₹50,00,000 installed. Per kilowatt this is among the most cost-efficient scales for a captive plant, since design, mobilisation and process costs spread across substantial capacity. Where a project sits in the band depends on structure, the point of connection, whether an HT interface is required and site logistics.

How much land or roof does a 100kW plant need?

About 7,500 sq ft of structurally sound, shade-free roof, or roughly half an acre for a ground-mounted array with proper row spacing and maintenance access. Many industrial sites end up with a split configuration — the sound portion of the roof plus a ground-mounted balance — which is frequently the better engineering answer.

How much can a factory save with a 100kW solar plant?

Around ₹14,40,000 a year at an industrial tariff near ₹9 a unit with strong daytime self-consumption, giving a simple payback of three to four years before accelerated depreciation is taken into account. A multi-shift operation self-consumes more of its generation and does better; a single-shift unit with weekend shutdowns exports more and does slightly worse.

Do I need an HT connection for a 100kW solar plant?

It depends on the site. Some 100 kW plants connect at LT into a main panel with sufficient headroom; others need an HT interface with its own transformer and protection scheme. Sanctioned load, existing transformer capacity, current utilisation and the DISCOM's requirements decide it — which is why the connection study happens before the design is fixed, not after.

Find out what a 100 kW system costs on your roof

Send us your last electricity bill and a photo of the roof. We will confirm whether 100 kW is the right capacity for your consumption, what it will generate at your location, what you can claim, and what the real payback looks like.

Request my free savings report